home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_2 / V11_212.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/Ea64dYq00VcJ83BE4D>;
  5.           Tue,  3 Apr 90 03:01:57 -0400 (EDT)
  6. Message-ID: <Ia64d-C00VcJ83=U5a@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Tue,  3 Apr 90 03:01:30 -0400 (EDT)
  11. Subject: SPACE Digest V11 #212
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 212
  14.  
  15. Today's Topics:
  16.            Payload Status for 04/02/90 (Forwarded)
  17.       Re: Fun Space Fact #1: Launcher Development Costs
  18.                Re: Solar Cells
  19.             Saturn V gone forever?
  20.              How does Comet Austin look?
  21.           Re: Will we lose another orbiter?
  22.               Re: Strange flash of light
  23.              Re: Shuttle Designs
  24.                  Re: Needles
  25.          HST orbit (was Re: Comparative Costs to LEO)
  26. ----------------------------------------------------------------------
  27.  
  28. Date: 2 Apr 90 20:11:37 GMT
  29. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  30. Subject: Payload Status for 04/02/90 (Forwarded)
  31.  
  32.  
  33.     Daily Status/KSC Payload Management and Operations 04-02-90.
  34.     
  35.     
  36.     - STS-31R HST (at pad-B) -
  37.     
  38.     The HST to orbiter interface verification test was completed
  39.     Friday.  HST battery charging was started third shift
  40.     Saturday and will continue through today.  HST confidence
  41.     testing was started third shift Sunday and will continue
  42.     through Tuesday.
  43.     
  44.     
  45.     - STS-35 ASTRO-1 (at OPF) -
  46.     
  47.     Igloo leak checks and DDU reinstallation were completed
  48.     Friday.  On Saturday ASTRO was powered up and retests of the
  49.     RAAB, DDU, and HDRR were successfully completed.  Today non-
  50.     power up closeouts will be performed.
  51.     
  52.     
  53.     - STS-40 SLS-1 (at O&C) -
  54.     
  55.     Preps for rack and floor installation into the module were
  56.     worked Friday and Saturday and will continue today.
  57.     Troubleshooting of the fire suppression system was also
  58.     worked on Friday.
  59.     
  60.     
  61.     - STS-42 IML-1 (at O&C) -
  62.     
  63.     Racks 4, 7 and 11 staging operations were worked on Friday.
  64.     Racks 5, 7, and 11 staging operations along with module
  65.     cable clamp inspections were active Saturday.  Racks 3, 5,
  66.     7, and 11 staging operations, module cable clamp inspections
  67.     and pyrell foam replacement are scheduled for today.
  68.     
  69.     
  70.     - STS-45 (Atlas-1)-
  71.     
  72.     On Friday hardpoints were installed on pallet 2.  Cold plate
  73.     support structures, flight trunnion, and handrail
  74.     installations were active Saturday.  Pallet joint kit
  75.     installation on frames 1 and 4 will be active today.
  76.     
  77.     
  78.     - STS-55 SL-D2 (at O&C) -
  79.     
  80.     Rack 12 staging activities were worked on Friday and will
  81.     continue today.
  82.     
  83.     
  84.     - HST M&R (at O&C) -
  85.     
  86.     ORUC cable installation will be active today.
  87.  
  88. ------------------------------
  89.  
  90. Date: Mon, 2 Apr 90 13:44:47 CDT
  91. From: mccall@skvax1.csc.ti.com
  92. Subject: Re: Fun Space Fact #1: Launcher Development Costs
  93.  
  94. > serre@boulder.colorado.edu  (SERRE GLENN)
  95.  
  96. > How is the present design more complex than the original design of 
  97. > the shuttle?  More engines, higher Isp, more computers, what?
  98.  
  99. I posted an (overly) long exposition on just why increasing size
  100. means increasing complexity some time back.  Rather than repost it,
  101. I'd suggest you simply think about the increased number of
  102. connection points, supports, wire runs and tiedowns, ducts, tubes,
  103. etc. that are necessary in a larger scale version of something.
  104.  
  105. If that doesn't make what I'm talking about clearer for you, EMail
  106. me and I'll send you a copy of the original article.
  107.  
  108.  
  109. ==============================================================================
  110. | Fred McCall  (mccall@skvax1.ti.com) | "Insisting on perfect safety is for  |
  111. | Military Computer Systems           |  people who don't have the balls to  |
  112. | Defense Systems & Electronics Group |  live in the real world."            |
  113. | Texas Instruments, Inc.             |                     -- Mary Shafer   |
  114. +-------------------------------------+--------------------------------------+
  115. |  I speak for me.  I don't speak for others, and they don't speak for me.   |
  116. ==============================================================================
  117.  
  118. ------------------------------
  119.  
  120. X400-Received: by /PRMD=inria/ADMD=atlas/C=FR/;
  121.     Relayed; 31 Mar 90 09:57:54+0100
  122. X400-Received: by /PRMD=SWITCH/ADMD=ARCOM/C=CH/;
  123.     Relayed; 31 Mar 90 09:56:28+0200
  124. Date: 31 Mar 90 09:56:28+0200
  125. From: Joseph C. Pistritto <jcp@cgch.uucp>
  126. Subject: Re: Solar Cells
  127.  
  128. >Mailer: Elm [revision: 64.9]
  129.  
  130. Solar Cell facts (from my recent forays into ground based solar
  131. photovoltaics):
  132.  
  133. 1) Solar flux at ground level is about 800 W/m2 (this figure is
  134.         used by most manufacturers).  At LEO, I believe the
  135.         figure is 1Kw/m2, but I'm not real sure.  This, by the
  136.         way is referred to as the "solar constant", even though
  137.         it isn't...
  138.  
  139. 2) Currently mass produced Si solar cells (civilian market), claim
  140.         efficiencies of 6-14%, there are 3 kinds commercially
  141.         available:
  142.                 1) Monocrystaline - single crystal silicon wafer
  143.                 cells - commerical efficiency 14%.  These appear
  144.                 solid deep blue.  Wouldn't surprise me if you could
  145.                 get a percent or two more thru selection, (milspec).
  146.  
  147.                 2) Polycrystaline - multi-crystal silicon wafer,
  148.                 cells - commercial efficiency 12%, slightly cheaper.
  149.                 Appears to be a collection of blue 'flakes'.
  150.  
  151.                 3) Amorphous - noncrystaline silicon - new process,
  152.                 These are a uniform brown color - commercial
  153.                 efficiencies 6-8%.  These are much cheaper to produce
  154.                 than types 1) or 2), but this fact doesn't seem to
  155.                 be reflected in the market prices, at least here in
  156.                 Europe.         
  157.  
  158. 3) There are other kinds of cells as well, (non-Si based), but these
  159.         have only smaller or specialized markets.  Cadmium-sulfide
  160.         comes to mind.  I think the first solar cells were CdS, actually,
  161.         but I'm not sure.  Efficiency is real low though (4%?).
  162.  
  163. 4) Gallium Arsenide (GAs) is in general safer from radiation effects
  164.         than Silicon, which is why the military is so interested in
  165.         GAs based computers, etc.  (GAs also has a higher electron
  166.         transport speed than Silicon, which would make for both more
  167.         efficient solar cells (less time for electrons/holes to
  168.         recombine), and faster computers.  Maybe this also is why
  169.         it's radiation resistance is higher, but I'm no solid state
  170.         physicist.
  171.  
  172. 5) Normal Silicon solar cells as used on satellites seem to decay at the
  173.         rate of several percent (2-3%) per year due to on-orbit radition
  174.         exposure.  For instance, the Magellan spacecraft has already lost
  175.         3-4% of its solar generating capacity due to solar flares (recent
  176.         activity is admittedly higher than normal, we're at a cycle peak).
  177.         A certain number of cells also fail due to thermal stress on the
  178.         electrodes & mountings, and I imagine at launch time as well.
  179.  
  180. --
  181. Joseph C. Pistritto (jcp@brl.mil -or- cgch!bpistr@mcsun.eu.net)
  182.  Ciba Geigy AG, R1241.1.01, Postfach CH4002, Basel, Switzerland
  183.  Tel: +41 61 697 6155 (work) +41 61 692 1728 (home)   GMT+2hrs!
  184.  
  185. ------------------------------
  186.  
  187. Date: 1 Apr 90 02:44:16 GMT
  188. From: venus!eas521jcs@CS.YALE.EDU
  189. Subject: Saturn V gone forever?
  190.  
  191.  
  192.      I recently attended a panel discussion in which someone commented
  193. that the technical blueprints for the Saturn V launch vehicle have disappeared;
  194. that noone at NASA knows where they are (or have gone).
  195.      I find this incredibly hard to believe.  Does anyone know if this is
  196. actually true?  And if so, is there any more of story behind the disappearance,
  197. or are the blueprints *just gone*?
  198.  
  199. ------------------------------
  200.  
  201. Date:     Sun,  1 Apr 90 12:21 CST
  202. From: Bill Higgins-- Beam Jockey <HIGGINS%FNAL.BITNET@UICVM.uic.edu>
  203. Subject:  How does Comet Austin look?
  204. Original_To:  SPACE
  205.  
  206. Anybody been able to see Comet Austin yet?  It's been pretty cloudy in the
  207. Chicago area...
  208.  
  209.      O~~*           /_) ' / /   /_/ '  ,   ,  ' ,_  _           \|/
  210.    - ~ -~~~~~~~~~~~/_) / / /   / / / (_) (_) / / / _\~~~~~~~~~~~zap!
  211.  /       \                          (_) (_)                    / | \
  212.  |       |                      Bill Higgins
  213.  \       /                      Fermi National Accelerator Laboratory
  214.    -   -                        Bitnet:                HIGGINS@FNALB.BITNET
  215.      ~                          Internet:             HIGGINS@FNAL.FNAL.GOV
  216.                                 SPAN/Hepnet/Physnet:         43011::HIGGINS
  217.  
  218. ------------------------------
  219.  
  220. Date: 1 Apr 90 13:57:53 GMT
  221. From: eru!luth!sunic!mcsun!ukc!icdoc!syma!nickw@bloom-beacon.mit.edu  (Nick Watkins)
  222. Subject: Re: Will we lose another orbiter?
  223.  
  224. In article <1990Mar28.160728.14260@cs.rochester.edu> dietz@cs.rochester.edu (Paul Dietz) writes:
  225. >It was NASA's responsibility to inform the public about the safe
  226. >flight rate of the system, not recklessly exceed it in a futile
  227. >attempt to preserve the myth of the shuttle's economic viability.  It
  228. >was NASA's responsibility to be honest about the potential
  229. >capabilities of the shuttle when it was being sold.  But, as Keyworth
  230. >noted, NASA is the only government adgency that outright lies.
  231. I am intrigued by the spelling, is adgency a contraction of advertising
  232. agency ...:-). Seriously though, the assertion that the CIA, DoD, State 
  233. Department, (and the NSA & NRO) never lie is one that I find a little
  234. hard to swallow. Perhaps this is  caused by the reading of too much Seymour
  235. Hersh et. al. on my part.
  236.  Maybe Keyworth  puts the boundary between lying and dissembling in a different
  237. place to where I would. Let he he who has enough brilliant pebbles to
  238. spare cast the first stone ...
  239.  
  240. Nick
  241.  
  242. "This operation is rather like the periscope of a submarine" - Mike
  243. Collins, July 1969.
  244. -- 
  245. Dr. Nick Watkins, Space & Plasma Physics Group, School of Mathematical
  246. & Physical Sciences, Univ. of Sussex, Brighton, E.Sussex, BN1 9QH, ENGLAND
  247. JANET: nickw@syma.sussex.ac.uk   BITNET: nickw%syma.sussex.ac.uk@uk.ac
  248.  
  249. ------------------------------
  250.  
  251. Date:     Mon, 2 Apr 90 15:06:26 CST
  252. From: Will Martin <wmartin@STL-06SIMA.ARMY.MIL>
  253. Subject:  Re: Strange flash of light
  254.  
  255. I finally located a newspaper article on the event that cited various 
  256. local astronomy types as stating the flash was definitely caused by a
  257. meteor. It didn't have much technical detail, and spent most of the 
  258. space discussing historic meteoric events.
  259.  
  260. Regards, Will
  261.  
  262. ------------------------------
  263.  
  264. Date: Mon, 2 Apr 90 13:31:36 CDT
  265. From: mccall@skvax1.csc.ti.com
  266. Subject: Re: Shuttle Designs
  267.  
  268. > agate!usenet@ucbvax.Berkeley.EDU  (William Baxter)
  269.  
  270. > >Fact 1:  The Shuttle is significantly bigger and has much more
  271. > >delta-v capacity than the original design.
  272. > The original 'design' was not well defined.  It was, for the most 
  273. > part, a set of promises about performance. (e.g. $100/lb to LEO, 
  274. > fully reusable)
  275.  
  276. It seems to have been well enough defined so that at least two
  277. people on the net (Henry Spencer and myself) seem to have at least a
  278. somewhat clear picture of what it would have been like.
  279.  
  280. > >Fact 2:  This redesign made the Shuttle much more complex.
  281. >  
  282. > You are comparing existing hardware with a bunch of promises.
  283.  
  284. So is it your contention, Mr. Baxter, that nothing that was said
  285. until after the first hardware was flying matters?  I thought that
  286. the thing that everyone was so upset about was the difference
  287. between "promises" and what got delivered.
  288.  
  289. Or do you just want to pick and choose which events count and which
  290. don't?
  291.  
  292. > >Fact 3:  This increase in complexity increased the maintenance
  293. > >requirements drastically.
  294. > Comparing apples and hypothetical oranges is irrelevant.  What's the
  295. > total launch cost of the 'original design,' and what is the unit cost
  296. > per kilo?  How much will it cost to build?  How does the maintenance
  297. > schedule differ from that of the existing Shuttle?
  298.  
  299. Then so is *any* plan, proposal, or anything like that, Mr. Baxter,
  300. including yours.  It is this very blindness about the overall
  301. picture of the budgetary process and how systems get developed and
  302. evolve that seems to be a continuing weak point of your whole
  303. position.
  304.  
  305. I certainly don't have those figures handy, not being associated
  306. with either NASA or a major contractor with them (SuperJim's
  307. innuendoes notwithstanding), but having some idea of what sort of
  308. detail goes into any kind of proprosal to a government agency, I
  309. have no doubt that there are at least first cut estimates of a lot of
  310. those things.
  311.  
  312. I thought you just said that nothing said before the first one flew
  313. (of whatever it was) mattered ("comparing existing hardware with a
  314. bunch of promises")?  You can't have it both ways, Mr. Baxter.
  315.  
  316. At least not if your intention is to try to be intellectually honest.
  317.  
  318. > New promises to Congress are commonly known as Space Station Freedom,
  319. > National AeroSpace Plane, Advanced Launch System, and the Moon-Mars 
  320. > Thing.
  321.  
  322. "Moon-Mars Thing".  I like that.  Nice technical project name there.
  323. ;-)
  324.  
  325. [And as for your munging of my signature, while it's no doubt
  326. 'cute', there is a word for statements which are placed in quotes
  327. and purport to be those of someone else, but which are not.  They are
  328. commonly called "lies" in most parts of the country.  There is also a
  329. name for the person who does it, just as there is a name for those
  330. who resort to personal attack when their position proves to be
  331. intellectually bankrupt.  I'll leave the net to draw its own
  332. conclusions about you from that; and I'd like to thank you for
  333. showing us all your true colors and once again validating my prior
  334. remarks about your propensity for putting people on "enemies lists"
  335. and just how one goes about getting put there.] 
  336.  
  337. > William Baxter
  338.  
  339.  
  340. ==============================================================================
  341. | Fred McCall  (mccall@skvax1.ti.com) | My boss doesn't agree with anything  |
  342. | Military Computer Systems           | I say, so I don't think the company  |
  343. | Defense Systems & Electronics Group | does, either.  That must mean I'm    |
  344. | Texas Instruments, Inc.             | stuck with any opinions stated here. |
  345. ==============================================================================
  346.  
  347. ------------------------------
  348.  
  349. Date: 1 Apr 90 03:09:58 GMT
  350. From: wuarchive!cs.utexas.edu!news-server.csri.toronto.edu!utgpu!utzoo!henry@decwrl.dec.com  (Henry Spencer)
  351. Subject: Re: Needles
  352.  
  353. In article <22701@watdragon.waterloo.edu> jdnicoll@watyew.waterloo.edu (Brian or James) writes:
  354. > Does anyone out there have information on an early (late fities
  355. >to mid-sixties) project to place millions of needled in LEO as a
  356. >passive radio relay. I *think* it was DOD related (a stop gap
  357. >technique to use if the US comsats got fried)...
  358.  
  359. Ah yes.  Project West Ford.  It was copper wires, actually, not needles.
  360. The idea was indeed to orbit a passive radio reflector that could not be
  361. shot down or destroyed in any simple way, for wartime military use.
  362. It was tried once in orbit, over the protests of the astronomers.  As I
  363. recall, basically it didn't work all that well, and the idea was dropped.
  364. -- 
  365. Apollo @ 8yrs: one small step.|     Henry Spencer at U of Toronto Zoology
  366. Space station @ 8yrs:        .| uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  367.  
  368. ------------------------------
  369.  
  370. Date: 3 Apr 90 01:32:01 GMT
  371. From: zaphod.mps.ohio-state.edu!uwm.edu!ogicse!zephyr.ens.tek.com!wrgate!mrloog!dant@tut.cis.ohio-state.edu  (Dan Tilque)
  372. Subject: HST orbit (was Re: Comparative Costs to LEO)
  373.  
  374. henry@utzoo.uucp (Henry Spencer) writes:
  375. >mac@idacrd.UUCP (Robert McGwier) writes:
  376. >>If the world wanted to put stuff in a 250km high, 28 to 58 degree inclination
  377. >>orbit, your numbers would be meaningful.  Since BY FAR, most of the
  378. >>LEO shots are polar...
  379. >
  380. >Um, you've forgotten a goodly assortment of science missions -- e.g. the
  381. >Hubble telescope -- which merely want to get into orbit and don't greatly
  382. >care which orbit.  Space is not just comsats and spooks.
  383.  
  384. Minor nit: they don't much care what orbit HST gets into except for it's
  385. altitude.  There's an interesting article in the April Sky & Telescope
  386. about the deployment of HST.  It's written by the Mission Specialist who
  387. will actually run the Arm (Steve Crawley, I think his name is).  In it he
  388. says the shuttle will try for about 570 Km altitude, which is as high as
  389. the shuttle can go with that load and still have some reserve fuel left.
  390.  
  391. The main reason they want the high altitude is due to the current high
  392. level of solar activity which degrades low orbits.
  393.  
  394. ---
  395. Dan Tilque    --    dant@mrloog.WR.TEK.COM
  396.  
  397. ------------------------------
  398.  
  399. End of SPACE Digest V11 #212
  400. *******************
  401.